New Engineering maintenance pits for Norwood bus garage

  
  

At Arriva London, we are always looking at ways of developing better methods of serving our customers and helping our staff to do their jobs more effectively. A most important part of this is to ensure that all our buses are fully serviceable and ready to go out on the route.

Preparing the site
Preparing the site

As part of our continuous improvement programme, investment has been made in our engineering facilities right across our seventeen garages. The programme started with the vehicle maintenance pit upgrade in Tottenham and Stamford Hill garages in North London, and has now extended to our garages in the South at Brixton and Norwood.

Off loading the prefabricated pit units
Off loading the prefabricated pit units

The upgrade has been carried out over several months as it is a major upheaval for the garages while day-to-day operations carry on. The work involves removing the old concrete pits and replacing them with steel pre-fabricated versions. The pits are deeper than the older versions, which were installed when the garages were built over fifty years ago, and were designed for the higher floor, step access buses of the time.

Working round the construction work
Working round the construction work

Apart from providing more space to work, the new pits are better illuminated and with the steel side walls painted gloss white, give much better reflective surfaces that are also far easier to maintain. They have also been extended to accommodate the increased length of the New Routemasters buses.

The transition has meant that the garages have had to share their servicing work with other Arriva London Engineering facilities.

Ready for use
Ready for use

As Norwood Engineering manager Micky Letts explains: -

The new pits in action
The new pits in action

“The transition has run really smoothly and none of the routes served by the garage have been affected by the change. We had a lot of noise and disruption during the pit refurbishment but boy was it worth every minute. The refurbishment has given us a much cleaner and better environment to work in for all staff, and it brings a smile to my face when I arrive for work each morning and walk into the new workshop area.”

If you are a PSV technician and would like to work for Arriva London, then please visit our recruitment page.

  
  

Tags:   News
Published : Thu 3rd Nov. 2016
All archived articles
Published : Mon 4th Sep. 2017 - Thu 28th Sep. 2017
 
Arriva London hold Macmillan Coffee Mornings in their garages

When our garage staff asked if they could support this year's Macmillan Coffee Morning, we were delighted to encourage them to do so.

Interim Employee Relations + Reward Manager

Based at Finsbury Park and reporting to the Arriva London HR Director (HRD), the Employee Relations + Reward Manager will be the lead on all matters related to employee relations, pay and benefits and other key HR initiatives.

Bees back at Brixton garage following green-fingered Roy’s gardening efforts

At Arriva London, we are always looking for ways to improve our environmental footprint, and are excited when our staff suggest ways in which they can also contribute to this aim.

Deputy Operating Manager - Barking, Dartford, Grays

Managing the garage operation for drivers, together with the Operating Manager, in conjunction with all other teams such as engineering and route performance.

Deputy Operating Manager - Enfield

Managing the garage operation for drivers, together with the Operating Manager, in conjunction with all other teams such as engineering and route performance.

Engineering Administration Assistant - Ash Grove

We have a vacancy for a Full Time Engineering Administration Assistant (38 hours per week) currently based at our Ash Grove garage.

 

Please wait...

 

.Delivered by CSN MCL / All content copyright © 2007 - 2018 original copyright holders, except where individually stated. All rights reserved. E&OE.