Arriva London’s Tottenham garage welcomes TfL graduate trainees

  
  

Explaining the inspection process before going into service
Explaining the inspection process before going into service

​Arriva London believes that training is the key to success and is always willing to help other organisations, particularly in the transport industry, to help train their staff. A recent request from TfL to show two groups of graduate trainees the rudiments of running a bus garage was no exception, and Arriva London’s Tottenham garage was chosen to host the visitors.

The Tottenham garage has all of the facilities needed to run modern bus routes, with the operations management to support the drivers, the engineering facilities to service and maintain the vehicles, and its own iBus Control Centre to regulate bus services, it is ideally suited to demonstrate the role.

Gary introduces the engineering facilities
Gary introduces the engineering facilities

The graduates were shown around the garage by operations manager Gary Smith, giving them an insight into how the garage runs, how the training is carried out, and how it fits into TfL as a whole.

Operating manager Gary Smith welcomes the graduate trainees
Operating manager Gary Smith welcomes the graduate trainees

First they visited the ‘Output’ the centre of communications for all of the drivers, where each driver signs in for their duty and receives details of their designated bus.

They then saw the Engineering pit areas, illustrating the engineering function, then onto the inside of the bus, demonstrating the safety checks drivers have to make on and around the bus before going into service.

Arriva's iBus control system

Arriva's iBus control system

Finally they visited the iBus control centre, the heartbeat of the routes, where controllers can see exactly where each vehicle is on the route, and be in touch to guide the driver safely and efficiently through the journey.

The graduates said they found it fascinating and had no idea how complex the operation was until seeing it for themselves.

  
  

Tags:   Newsgraduatetraining
Published : Tue 22nd Sep. 2015
Related archived articles
Published : Wed 15th Mar. 2017 - Tue 25th Apr. 2017
 
Ash Grove garage holds community open day

In association with TfL and HCT Transport, we opened our doors to welcome the public, giving them the opportunity to explore the garage, meet our operations teams, ride on a bus through the bus wash, tour our operations control centres and see & ride on some historic preserved buses.

Arriva London begin operating route 19 from Finsbury Park to Battersea

Our recent route gains in North London include route 19, from Finsbury Park to Battersea Bridge (South Side), which has meant implementing an extensive mobilisation programme to maintain our high standards.

Learning is a key feature at Arriva London, for better bus services and customer satisfaction

One of the most important elements in Arriva London’s development is the training and education it offers its staff, from engineering apprentices to graduate trainees, everyone in the business is offered the opportunity to develop and flourish.

Great Customer Experience from Arriva London with the introduction of Route 249

The introduction of all new Hybrid vehicles on route 249, which Arriva London starts operating this Saturday, underlines one of our key brand values - ‘Great customer experience - We keep our customers happy every day’.

Arriva London to commence operating route 259

The new contract, which starts this Saturday 25th March, will have over 60 drivers and 25 new environmentally friendly hybrid buses.

Arriva London runs the route 48 service from Walthamstow Central to London Bridge

Arriva London is proud and delighted to be operating the recently awarded route 48 TfL contract, running between Walthamstow Central and London Bridge.

 

Please wait...

 

.Delivered by CSN MCL / All content copyright © 2007 - 2018 original copyright holders, except where individually stated. All rights reserved. E&OE.