It’s brand new maintenance pits for Arriva London

  
  

We are always looking at ways of developing better methods of serving our customers and helping our staff to do their jobs effectively. A most important part of this is to ensure that all of our buses are fully serviceable and ready at all times to go out on the route.

With this in mind the company has initiated an investment programme to improve engineering facilities, starting with upgrading the vehicle maintenance pits in both Tottenham and Stamford Hill garages in North London.

The upgrade has been carried out over several months as it can be a major upheaval for the garages while day to day operations carry on. The work involves removing the old concrete pits and replacing them with steel pre-fabricated versions. The pits are deeper than the older versions, which were installed when the garages were built over fifty years ago, and were designed for the higher floor, step access buses of the time. 

Apart from providing more space to work, the new pits are better illuminated and with the steel side walls painted gloss white, give much better reflective surfaces that are also far easier to maintain. They have also been extended to accommodate the increased length of the New Routemaster buses now in service on routes 73 and 149.

The transition has meant that the garages have had to share their servicing work with Arriva London’s Engineering facility at Edmonton, but as Charlotte Whitfield, the General Manager for Tottenham and Stamford Hill, said:-

“Thanks to all of our staff and our colleagues’ cooperation, the transition has run really smoothly and none of the routes served by these garages have been effected by the change. We are very proud of our new engineering facilities and look forward to the improvements they will bring to service delivery in London”

  
  

Tags:   NewsEngineering
Published : Thu 11th Feb. 2016
Related archived articles
Published : Thu 23rd Feb. 2017 - Thu 30th Mar. 2017
 
Great Customer Experience from Arriva London with the introduction of Route 249

The introduction of all new Hybrid vehicles on route 249, which Arriva London starts operating this Saturday, underlines one of our key brand values - ‘Great customer experience - We keep our customers happy every day’.

Arriva London to commence operating route 259

The new contract, which starts this Saturday 25th March, will have over 60 drivers and 25 new environmentally friendly hybrid buses.

Arriva London runs the route 48 service from Walthamstow Central to London Bridge

Arriva London is proud and delighted to be operating the recently awarded route 48 TfL contract, running between Walthamstow Central and London Bridge.

All aboard the Arriva London bus to celebrate 2017 World Book Day

Local Haringey Rowland Hill pre-school pupils were again treated to a very special way to celebrate World Book Day last Thursday 2nd March.

Getting closer to London’s transport heritage

Getting closer to London’s transport heritage can be achieved in many ways. At Arriva London, we pride ourselves on supporting that heritage as corporate members of the London Transport Museum.

Arriva London starts running TfL bus route 48 service this Saturday

Arriva London is pleased to have been awarded the contract to operate TfL bus route 48 between Walthamstow Central and London Bridge. 

 

Please wait...

 

Delivered by CSN MCL / All content copyright © 2007 - 2017 original copyright holders, except where individually stated. All rights reserved. E&OE.