New Engineering maintenance pits for Norwood bus garage

  
  

At Arriva London, we are always looking at ways of developing better methods of serving our customers and helping our staff to do their jobs more effectively. A most important part of this is to ensure that all our buses are fully serviceable and ready to go out on the route.

Preparing the site
Preparing the site

As part of our continuous improvement programme, investment has been made in our engineering facilities right across our seventeen garages. The programme started with the vehicle maintenance pit upgrade in Tottenham and Stamford Hill garages in North London, and has now extended to our garages in the South at Brixton and Norwood.

Off loading the prefabricated pit units
Off loading the prefabricated pit units

The upgrade has been carried out over several months as it is a major upheaval for the garages while day-to-day operations carry on. The work involves removing the old concrete pits and replacing them with steel pre-fabricated versions. The pits are deeper than the older versions, which were installed when the garages were built over fifty years ago, and were designed for the higher floor, step access buses of the time.

Working round the construction work
Working round the construction work

Apart from providing more space to work, the new pits are better illuminated and with the steel side walls painted gloss white, give much better reflective surfaces that are also far easier to maintain. They have also been extended to accommodate the increased length of the New Routemasters buses.

The transition has meant that the garages have had to share their servicing work with other Arriva London Engineering facilities.

Ready for use
Ready for use

As Norwood Engineering manager Micky Letts explains: -

The new pits in action
The new pits in action

“The transition has run really smoothly and none of the routes served by the garage have been affected by the change. We had a lot of noise and disruption during the pit refurbishment but boy was it worth every minute. The refurbishment has given us a much cleaner and better environment to work in for all staff, and it brings a smile to my face when I arrive for work each morning and walk into the new workshop area.”

If you are a PSV technician and would like to work for Arriva London, then please visit our recruitment page.

  
  

Tags:   News
Published : Thu 3rd Nov. 2016
Related archived articles
Published : Wed 10th Aug. 2016 - Fri 30th Sep. 2016
 
Golden Bus from Arriva London for children’s cancer charity Momentum

Momentum held the Family Fun Day picnic and the Golden Bus Trip for around a dozen families that it supports, who have children currently undergoing cancer treatment or who are in remission.

Arriva London paints a bus Platinum to celebrate 1,000 staff giving to 160 charities every Pay day through Payroll Giving

When Arriva London started their Payroll Giving promotional program in 2014, encouraging more staff to get involved with giving to charity through the Payroll Giving scheme, they didn’t realise how welcoming the staff would be to the idea, and how generous the Payroll Givers would be.

A summer of fun for the Arriva London Heritage Fleet

The Arriva London Heritage Fleet is the company’s way of maintaining a moving history of London.

Arriva London’s Rail Replacement bus service an on-going success

Whilst the London Overground service between Gospel Oak and Barking is being electrified and the stations modernised, a replacement bus service is in operation to cover the closure.

Arriva London helps a retired bus driver make his dream come true

We recently received a request passed on by TfL and, as all the elements were right at the time, decided to help make a bus driver’s dream come true.

 

Please wait...

 

Delivered by CSN MCL / All content copyright © 2007 - 2017 original copyright holders, except where individually stated. All rights reserved. E&OE.